技改方案及节能效益分析
文章来源:未知      发布者:admin
1、技改方案: Technology improving plan  
将锅炉或电厂的蒸汽通进高温塔, 将高温塔内的水加热到压机设定的温度, 通过循环水泵将过热水打进压机进行升温。不同的过程通过电脑控制自动阀门, 将不同温度的蒸汽、热水和冷水按生产工艺的要求有序地运行。既满足了生产工艺的需求, 同时也节约了能源。Input the steam in boiler or power plant into high temperature tower, heat the water in high temperature tower to setting value and pump the hot water by circulating pump into compressor for heating. The procedures would be controlled by computer. The steam, hot water and cold water would operate automatically according to different requirements which not only meets processing condition but saves energy.

2节能项目施工要求: Construction requirement on energy saving project:  
项目设计制造周期为80天, 安装周期为30天。Design and manufacture needs 80 days and installation needs 30 days.

3 项目预算回收期: Payback period of project budget
本项目预计回收期为240-300天 The payback period for this project is 240-300 days.

常州市久诺机械成套设备有限公司
公司地址:江苏省常州市钟楼区紫荆东路
联系人:黄先生
咨询电话:13337898932
公司传真:0519-89816288
公司网址: http://www.czjnjx.cn
© 2016-2019 常州市久诺机械成套设备有限公司 版权所有 备案号:苏ICP备16033690号-1 关键词:过热水,过热水设备,过热水工艺,防火板过热水,压机过热水